This Old House (1979)
S45E11 Lexington: Electrical Bond
Episode Overview
Prior to the crane's arrival for the therapy pool installation, the copper bonding system is put in place. Meanwhile, the chosen tiles are unveiled. The entrance ramp now features a snow-melting system and receives its final concrete surface. Additionally, the elevator disconnects are successfully set up.