Mega Mechanics (2019)
S01E06 Shiny and New
Episode Overview
The Mega Mechanics team faces a complex challenge as they transition to new technology. The installation of a $10 million jet engine in an A330 requires a sophisticated support and bracing method. Meanwhile, the team prepares for the installation of a massive 550-tonne excavator, which demands 24 hours of meticulous prep for a process that must be completed in mere seconds. At the sugar mill, they tackle the messy job of replacing the mud filter, and in Newcastle, a coal handling vibro-gate creates unexpected issues.