Home Movies Series
Genres
Year
Episodes Most Viewed Movies Most Viewed TV People
The Tunnel S31E25 backdrop

The Tunnel (2013)

S31E25 Roxbury; Looking Back and Looking Ahead

Mar 27, 2010 Season 31 Episode 25 Action & Adventure, Crime, Drama, Mystery

Episode Overview

As the final week in Roxbury approaches, tile contractor Angelo McRae teaches Kevin the process of installing meshed white subway tiles along with a rail cap for the kitchen backsplash. Kevin then heads to our Washington, D.C. project house to meet the family who has moved in and to see the results of our last non-profit development project. Meanwhile, general contractor Tom Silva assists lead carpenter Colin Paterson in customizing and installing the stair treads and newel post for the newly constructed stairs.

The Tunnel poster
HD S31