Home Movies Series
Genres
Year
Episodes Most Viewed Movies Most Viewed TV People
The Tunnel S36E16 backdrop

The Tunnel (2013)

S36E16 Lexington Project 2015: Part 8: Conservation Concerns

Feb 21, 2015 Season 36 Episode 16 Action & Adventure, Crime, Drama, Mystery

Episode Overview

The installation of a concealed gutter takes place, along with a detailed plan for an infiltration system that channels water from the gutters into the soil. Discussions revolve around incorporating native plants to restore portions of the lawn to its natural state. The team also addresses the existing aluminum wiring while upgrading the recessed lighting and adding sconces above the mantel. Additionally, two different styles of windows are developed and tested for the project.

The Tunnel poster
HD S36