The Tunnel (2013)
S45E21 Glen Ridge: Roughed In
Episode Overview
The installation of the new flangeless windows is complete, ensuring they are sealed against water and air. Work commences on setting up in-ceiling speakers. A trip to the iconic Empire State Building is taken. To reduce material waste, the porch decking is put in place, and a hybrid plumbing system is selected for the home.